Installation of water and sewage lines in the city of Sheki (2nd stage

Reconstruction of water resources and existing storage tank No. 5 (Volume: 1,000 m3); - Construction of transmission line and new warehouse No. construction of new warehouse (No. 2, 3 & 4), each with a volume of 3,000 m3; - Transmission line (HDPE, up to DN400, length approx. 6.1 km) between existing Warehouse No. 1 and new Warehouse No. 2, and from No. 2 to Warehouse No. 3 and from No. 3 to No. 4 warehouse. – Transmission line from the Kish River - Construction of a new transmission line (steel pipe, ND 200, length: 6.6km. Reconstruction of the existing reservoir with a capacity of 1000m3 between reservoir No. 5 and the Kish River: In addition: - HDPE Water network line DN255-DN90 – 3338m - CHDPE sewage line

Customer:

Azərsu ASC

End :

Continue..