6 units with a diameter of 173-178 mm and a depth of 150-180 m in the Gababla region, 13 units with a diameter of 2290-300 mm and a depth of 150-180 m in the Zagatala region, 6 units with a diameter of 206-211 mm and a depth of 150 m in the Oguz region, a diameter of 150 m in the Sheki region Drilling of 13 wells with a depth of 226-238 mm and 150-220 m, 5 wells with a diameter of 43-50 mm and a depth of 170-180 m in Balakan region, installation of pumps and other equipment according to the project
Meliorasiya və Su Təsərrüfatı ASC
Continue..